Tel: 01407 860186
Mo: 0791 7700831

5 No bore holes by cable tool for Geotechnics

Monday, 28 April 2014 00:00

Ph drilling were contracted By Geotechnics Of Chester to drill 5 No bore holes by cable tool method at Beaumaris, Anglesey, North Wales.
The project, a water monitoring flood prevention Scheme, required 1 bore hole to 5 metres drilled on the sea front with full geotechnical sampling and a 19mm piezometer installation for water monitoring.

At the rear of the Castle a further 4 bore holes where drilled to 8 metres with full geotechnical sampling and water observations while drilling.